Today we are going to introduce the installation inspection, material quality control and installation of diesel generator sets in water conservancy projects, hoping to help you. Environmental inspection before installation of diesel generator set Before the installation of diesel generator set, all civil works shall meet the following requirements in addition to the requirements of technical specifications. 1. The environment in the machine room is clean, well ventilated and dry; 2. There should be no articles that can produce acid, alkali and other corrosive gases in the machine room; 3. Ventilation and exhaust facilities shall be installed; 4. There shall be no other objects in front of the radiator of the unit. Material quality control of diesel generator 1. The capacity specification of diesel generator set must meet the design requirements. 2. Check the main engine, accessories, special tools, spare parts and attached technical documents according to the packing list, check ...
This blog mainly shares technical problems and solution of diesel generator set