If you don't know about Siemens generator/alternator dismantling, assembling, and control principle, this article will show you more. 6.1 Dismantling This work must always take place in a clean environment containing no dust or moisture. The cable entry plate must be removed before the generator is actually dismantled. The terminal box must be opened in order to do so, and the exciter cables and bearing thermometer leads loosened. When the bolts adequate have been loosened, the guard over the rotating rectifier can be removed and the three-phase bridge or varistor replaced. When adequate bolts have been loosened, the two bearing can be forced off with the aid of the extraction tool and the tapped holes in the end shields. The bearings can then be inspected or replaced. The stator and rotor windings of the primary machine and the exciter can be checked after the rotor has been lifted out. 6.2 Assembling The generator must be re-assembled in reverse order. Suitabl...
This blog mainly shares technical problems and solution of diesel generator set