Connection • The installation must be prepared for well and carried out with the greatest care. • Secure the connecting cable between the engine and instrument panel with clamps. Bear in mind that connector blocks must be mechanically secured so that they are not exposed to any pulling forces. • The cables must not be run close by hot engine components or close to any other heat source. Ensure that the cables are protected from mechanical wear, sharp edges and water splashes. If necessary, the cables can be run through conduits. • As far as possible, avoid splices in the system wiring. The cables and any splices must be accessible for inspection and service. NOTICE! Connectors must be assembled “dry”, they must not be filled with petroleum jelly or similar. Power supply NOTICE! The engines are equipped with 2-pole electrical systems. This means that the battery negative cable...
This blog mainly shares technical problems and solution of diesel generator set