The correct maintenance of diesel generator set is the key to prolong the service life and reduce the cost of diesel generator. Meanwhile, proper maintenance can also keep diesel generator working efficiently. How to maintain diesel generator set? The useful tips are as follows: 1. After the installation of the diesel generator set, the sealing inspection should be done before starting. In addition, the generator must be started under no load. 2. For the newly purchased diesel genset , it must be run in 60 hours before used. 3. After the start of diesel generator set, it must be run 3-5 min under no load, then it can be allowed to accelerate and load. When the water temperature is higher than 75℃, the oil temperature is higher than 50℃, and the engine oil pressure is higher than 0.25MPa, it can be allowed to work normally. 4. For the new supercharged diesel engine or the new replacement supercharger, which must remove the inlet connector on supercharger, filling in 50...
This blog mainly shares technical problems and solution of diesel generator set