Assembly of Diesel Generator Set Exhaust Turbocharger


Assembly of diesel generator set exhaust turbocharger

1. With the compressor end of the middle casing facing up, insert the spring retaining ring into the inner ring groove of the bearing end of the compressor. Then place the floating bearing with the oil on it and the thrust ring into the other spring retaining ring. When installing a floating bearing, turn the end with the oil groove on the side. After each spring snap ring is installed, check that the snap ring is fully inserted into the ring groove.

2. With the turbine end of the intermediate casing facing up, the spring snap ring, the floating bearing, and the thrust ring are sequentially loaded into the turbine end bearing hole in the same order as in the step 1. When installing the floating bearing, care should be taken to raise the end of the oil groove on the side.

3. Two rings made of thin wire are placed over the fingers, and the two elastic sealing rings are opened and inserted into the turbine rotor shaft seal ring groove. 

4. When installing two elastic sealing rings on the turbine rotor shaft, the opening position should be shifted by 180 degrees. Then apply cleaning oil on the sealing ring and carefully insert the rotor into the middle casing to prevent the ring from slipping or breaking from one side. The position of the elastic sealing ring relative to the rotor shaft is centered and guided by the upper tapered surface of the intermediate housing hole.

5. Hold the turbine wheel that has been loaded into the intermediate casing with your hand and clamp the hexagonal shoulder at the turbine impeller to the vise. Take care to prevent the turbine rotor shaft from slipping out of the intermediate casing.

6. Place the thrust piece and the spacer on the shaft, and put the thrust bearing on the cleaning oil. Note that the oil inlet hole above the plane of the thrust bearing should be directed downwards to the oil inlet hole on the middle casing, and then the retaining washer is placed. After tightening the 4 bolts, the retaining washer is flanged and the 4 bolts are locked. Place another thrust piece on the shaft and insert it into the oil retaining plate. Note that the oil guiding tongue on the oil retaining plate must extend into the oil returning chamber.

7. Put the shaft seal that has the elastic sealing ring on the cleaning machine oil and put it into the corresponding seat hole on the end seal plate of the compressor. Before loading, the opening positions of the two rings are staggered so that they are separated by 180 degrees. Put the compressor air-sealing ring into the outer ring groove of the compressure air-sealing plate. In order to facilitate pressing into the middle casing, apply some thin oil on the outer surface of the rubber sealing ring and press it into the middle shell body.

8. After aligning the rotor and the compressor impeller with the dynamic balance mark, put on the compressor impeller, screw the self-locking nut and tighten it until it is aligned with the dynamic balance mark on the shaft end face. When tightening, do not allow the compressor impeller to be opposite to the compressor. The shaft has a rotation.

9. Remove the assembled assembly from the vise and insert it into the leafless volute according to the original mark. Be careful not to skew during assembly, install the turbine end plate and the stop washer, and tighten the hex nut.

10. Install the compressor casing alignment mark into the middle casing. Insert the “V” clamp into the middle casing before assembly, and pay attention to the installation without bending, so as to avoid the arc of the compressor casing from hitting the top of the compressor impeller blade. Install the “V” shaped clamp and tighten the bolts.

11. After injecting the cleaning oil into the oil inlet hole of the middle casing, the impeller should be rotated flexibly by hand.

12. After the final assembly, measure the next two items

A. Measurement of the axial movement of the turbine compressor. Place the iron table with the dial gauge on the plane of the volute flange and the end of the measuring rod of the dial indicator at the hexagonal shoulder plane at the turbine impeller exit. Above, the maximum axial movement is measured by pushing and pulling the rotor shaft by hand, and the value should be less than 0.25mm. If this value is exceeded, the combination of the thrust bearing and the thrust piece should be further checked. This method can be used for the determination that the supercharger has been installed in the unit.

B. After pressing the self-locking nut on the rotor shaft with a finger, measure the minimum clearance between the compressor impeller blade and the compressor casing with a thickness gauge. The clearance should be greater than 0.15mm. If it is less than this value, it should be disassembled and inspected.



Comments

Popular posts from this blog

What Is the Difference Between Electric Motor and Electric Generator

An electric motor is an electrical machine that converts electrical energy into mechanical energy. Most electric motors operate through the interaction between the motor's magnetic field and winding currents to generate force. In certain applications, such as in regenerative braking with traction motors, electric motors can be used in reverse as generators to recover energy that might otherwise be lost as heat and friction. An electric generator operates in the reverse direction, converting mechanical energy into electrical energy. Electric generator can be divided into various type, open type, silent type, trailer type, portable type and container type, etc. Electric generator is mainly composed of diesel engine & alternator. Electric generator set is mainly composed of engine, alternator, control module, and common base. Electric generator :- Electric generator is a type of machine which converts mechanical input (energy) into electrical output (...

Engine Fault Code Messages - Volvo Penta Engine

Volvo Penta Engine Fault Code When a malfunction has occurred and the diagnostic system has generated one or more fault codes, these are read out differently depending on the equipment used. Please refer to “Fault code messages”. If the system indicates that a fault code has been set: 1 Cut engine speed to idle, or shut the Volvo engine off. 2 For DCU/DU Read the fault code from the display, please refer to Reading fault codes via the DCU or Reading fault codes via the DU. For CIU press the diagnostic button and read the fault code, by observing the flashing of the diagnostic lamp. Refer to Reading fault codes via the diagnostic lamp, CIU. 3 Look up the fault code in the Fault Code Register chapter and take the recommended measures. Reading fault codes via the DU (Display Unit) Depending on the severity of the fault the text, either WARNING! or ALARM STOP (a buzzer sounds) will be shown on the display 1 Press any button to come to the fault list. The f...

Yuchai 4D24 & 4D24T Series Diesel Engine Operation Guide

Yuchai 4D24 & 4D24T series off-highway diesel engines are developed by RAYWIN POWERTRAIN TECHNOLOGY CO., LTD. with international engine R&D institutions together. Adopted tunnel block, rotary fuel pump (mechanic or electric governor), turbocharged/naturally aspirated and 2-valve technologies, 4D24 series engines are with reliable, fuel-efficient and strong power characters. It could be applied for agriculture & garden fields, construction equipment, power generation , marine and industrial equipment. General Safety Rules Incorrect procedures, carelessness or neglect of warning instructions may cause burns, cuts, body mutilation, asphyxiation or other injury or even death. Before maintenance, please read and understand all the security measures instructions and warnings carefully. The following pages contain a general security measures to ensure personal safety that you should follow. ◆ Maintenance area should be dry, bright and well ventilation, no sund...