What do you know about Marathon MX Series three phase AC synchronous brushless generator? In the previous
article, we have talked about the general information and installation of the
generator. In this post, you will learn the inspection, operation and maintenance
of Marathon MX Series 3 phase alternator.
V.
Inspection and operation
1.
Inspection:
a. Though
the generator, AVR and auxiliary devices are solid and well insulated, if the
generator was stored for longtime, it might be moistened or failed and should
be inspected carefully before operation.
b. Measure
the insulating resistance of windings against the ground by megohm-meter, if
the value is less than 2 MΩ in cold condition, the generator should be dried.
Caution: At
measuring, the electronicelements and capacitor should be short circuit, and
the AVR should be disconnected to avoid damage.
c. Make sure
all connecting joints are tight and connected well.
d. Be sure
the frame is properly grounded, and ground wire should be same as the size of
lead wires.
e. Be
familiar with the related data of nameplate before operation.
f. Slowly
turn rotor of two bearing generator to assure there is no bumping, scraping and
abnormal cacophony.
2. Voltage
adjustment:
The
generator output voltage is adjusted in routine test, and in common with the
rated voltage. If desired voltage is different, making adjustment see the DVR
voltage regulator manual.
3. DVR
voltage regulator:
The wiring
principle diagram and various settings are shown in the DVR manual.
4.
Operation:
After
inspection and adjustment have been made, and no trouble is found, the
generator can run normally and generate the electricity. In order to keep
generator running well, please remember following notices:
a. The
generator output must be disconnected from the load, then start the prime
mover.
b. Check the
speed and adjustment to the rated PRM. The voltage of generator will get to
normal value.
Then, close
the main circuit breaker to the load. The Gen-set speed may be changed under
load, and the
frequency
may be lower than normal frequency. Check and adjust the speed as necessary.
c. Before
shut down the Gen-set, remove load and turn off the main circuit breaker.
d, Three
phase generator should be operated at balanced load. More attention should be
paid to the load and the balance of current to prevent the generator running
load on the single phase or serious unbalancing condition, or the AVR and
generator may be damaged.
VI.
Miantenance Overhaul
1.
Maintenance:
a. Routine
overhaul should be done frequently. Usually, maintenance period depends on the
operation environment.
b. Generator
should be installed in the dry, clean, ventilating place to prevent the direct
contact of wind driven dirt, rain, snow and sunlight.
c. Take note
of the ventilation and heating of generator at times, and the current and
voltage don’t exceed the rating data.
d. Check all
living parts to see whether the interface is tight, and screw & nut are
right, so as to assure the grounding and electric function.
e. Pay
attention to the vibration and the noise when the generator is operating and
deal with the abnormal conditions.
f. If
necessary, insulation resistance should be measured by 500V Megohm-meter.
g.The
generator should not be operated at the place where full of water vapor, dust
and flammabfe gas.
h.The
bearing in the bearing house should be re-lubricated once annually or per
3000~5000 hours running, If the environment is bad, the times of re-lubrication
should be more often. The grease added into the bearing house should be
compatible with SRI-2, or grease will degenerate and the bearing may be
damaged.
2. Major
overhaul — Usually, can be done with engine:
a. Measure
insulating resistance with 500V megohm meter. If the reading is less than 2 MΩ,
the generator should be dried. (Must disconnect AVR with generator during
measuring).
b. Clean the
interior of generator by blowing and take care of the all junctions. lf inner
contaminate is serious, clean with cleaner or soivents (petrofeum drstillates),
then water cleaning and varnish treatment.
c. Inspect
all living parts and make sure joint nut is tight and contact well.
d. Inspect
all insulation and wirings to see whether there are any problems such as
damage, falloff, cautery, etc. lf necessary, do some rebinding, varnish and
baking to the generator.
e. Replace
the grease in the bearing house, and clean the surface of two shield bearing or
replace the bearing.
3. Overhaul
attention:
a. Take care
of the disassembled parts and avoid bumping each other or missing.
b. Should
lightly place main parts such as rotor, stator, bracket, etc to prevent damage.
c. In order
to reassemble easily, should make the mark for the disconnected wiring and
avoid wrong connecting.
d.
Disassembled bearing and bearing cap should be covered by clean paper to prevent
dirt or replace the dirty grease,
e. After
double-bearing generator is reassembled, should rotate the rotor slowly, ensure
there is not abnormal sound and halt.
f. The
bracket screws should be driven crosswise. Don’t drive the screws one by one.
g. Please
use Cheveron SRI or equivalent anti-friction, high quality grease (temperature
range of -30℃~175℃). The l/3~1/2 of bearing house filled with
grease is enough. Please remember the reservoir can't be too full.